Review on Optimization of Construction Project Scheduling Using Metaheuristic Algorithms

Authors

  • Anubha Sahu, Mrs. Ragini Mishra

Keywords:

Scheduling, Genetic algorithms, Delays, Project management, Optimization technique.

Abstract

This review paper presents a comprehensive analysis of the application of metaheuristic algorithms for optimizing construction project scheduling. Various algorithms including Genetic Algorithm (GA), Particle Swarm Optimization (PSO), Ant Colony Optimization (ACO), Simulated Annealing (SA), Grey Wolf Optimizer (GWO), Firefly Algorithm (FA), and hybrid metaheuristic approaches are critically reviewed. The study examines their effectiveness in minimizing project duration, reducing overall cost, balancing resource allocation, and managing project risks under deterministic and uncertain environments. Furthermore, this paper categorizes existing research based on problem formulation, objective functions, constraint handling techniques, and algorithm performance metrics. Comparative insights into single-objective and multi-objective scheduling models are discussed, highlighting strengths, limitations, and computational efficiency of each approach. Current research gaps, challenges in real-world implementation, and future research directions—such as hybrid intelligent models and integration with software are also identified. This review aims to provide researchers and practitioners with a structured understanding of metaheuristic-based scheduling optimization and a foundation for developing advanced decision-support tools in construction project management.

References

Cheng, M. Y., & Sholeh, M. N. (2025). Artificial satellite search: A new metaheuristic algorithm for optimizing truss structure design and project scheduling. Applied Mathematical Modelling, 143, 116008.

Vahidi, J., & Golmaei, S. M. (2025). Optimizing Construction Scheduling Using the Sine Cosine Algorithm (SCA) with Building Information Modeling (BIM). Results in Engineering, 107100.

You, S. S., Cuong, T. N., & Kim, H. S. (2025). Optimizing quay crane scheduling using deep reinforcement learning with hybrid metaheuristic algorithm. Engineering Applications of Artificial Intelligence, 143, 110021.

Li, Y., Wu, J., Hao, Y., Gao, Y., Chai, R., Chai, S., & Zhang, B. (2024). Process scheduling for prefabricated construction based on multi-objective optimization algorithm. Automation in Construction, 168, 105809.

Rajabi, R., & Yakhchali, S. H. (2025). Optimizing cash flow in construction portfolios: A metaheuristic approach from the organization’s perspective. Ain Shams Engineering Journal, 16(2), 103259.

Hu, Z., Wang, F., & Tang, Y. (2025). Cost optimization of repetitive project scheduling through a constraint programming-based relax-and-solve algorithm. Automation in Construction, 176, 106272.

Wang, W. C., Tian, W. C., Zang, H., & Zhang, X. T. (2025). Comprehensive Performance Assessment of State-of-the-Art Metaheuristic Algorithms for Multi-Scenario Reservoir Flood Control Optimization. Results in Engineering, 107132.

Toaza, B., & Esztergár-Kiss, D. (2023). A review of metaheuristic algorithms for solving TSP-based scheduling optimization problems. Applied Soft Computing, 148, 110908.

Liu, C. Y., & Chou, J. S. (2025). Automated legal consulting in construction procurement using metaheuristically optimized large language models. Automation in Construction, 170, 105891.

Shishehgarkhaneh, M. B., Basiri, M., & Azizi, M. (2024). Whale Optimization Algorithm (WOA) for BIM-based resource trade-off in construction project scheduling. In Handbook of Whale Optimization Algorithm (pp. 329-346). Academic Press.

Tomczak, M., & Jaśkowski, P. (2024). Customized particle swarm optimization for harmonizing multi-section construction projects. Automation in Construction, 162, 105359.

Azizi, M., Shishehgarkhaneh, M. B., Basiri, M., Moehler, R. C., Fang, Y., & Chan, M. (2025). Wolf-Bird Optimizer (WBO): A novel metaheuristic algorithm for Building Information Modeling-based resource tradeoff. Journal of Engineering Research, 13(2), 763-785.

Wang, J., Liu, H., & Wang, Z. (2023). Stochastic project scheduling optimization for multi-stage prefabricated building construction with reliability application. KSCE Journal of Civil Engineering, 27(6), 2356-2371.

Peiris, A., Hui, F. K. P., Duffield, C., & Ngo, T. (2023). Production scheduling in modular construction: Metaheuristics and future directions. Automation in Construction, 150, 104851.

Taghaddos, M., Mousaei, A., Taghaddos, H., Hermann, U., Mohamed, Y., & AbouRizk, S. (2024). Optimized variable resource allocation framework for scheduling of fast-track industrial construction projects. Automation in Construction, 158, 105208.

Downloads

How to Cite

Anubha Sahu, Mrs. Ragini Mishra. (2025). Review on Optimization of Construction Project Scheduling Using Metaheuristic Algorithms. International Journal of Research & Technology, 13(4), 690–699. Retrieved from https://ijrt.org/j/article/view/769

Similar Articles

1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.